Digital Site Tracker

Site progress, synced with your BIM model.

Track construction progress on the 2D floor plans your site team already works with. Every update stays connected to the BIM model automatically, with no double entry and no lost data.

Built from real delivery on a national-scale government project.

Synced just now
Areas and points
RebarFormworkConcrete pourNot started
Overall progress0%
On site, in your pocket

Built for the phone in your hand.

The people who know the real progress stand on site, not at a desk. So every screen is built for touch: select points, fill progress and check status right from the site. Swipe to see the same app on a tablet and a laptop.

  • Built for touch, no training. Select one point or many, set the date, and the whole team sees the new color right away.
  • Same app everywhere. Phone on site, tablet at the container office, laptop at the project office. Nothing to install.
  • Light enough for weak signal. No 3D model to download, so it keeps working where the site connection does not.
9:41 Plan 1 · Correct dataTower A › STR · S-101 57 K2D · Column K1Zone K2D · ID D1-C-91. RebarYYYY/MM/DD2026/11/21-1Today2. Formwork4 points selectedRebar, applied to all four1. RebarYYYY/MM/DD2026/11/21-1Today2. Formwork HomePlansRankTeam

Phone The full tracker, right in your pocket.

Plan 1 · Correct dataTower A › STR 57% Not yet1. Rebar2. Formwork3. Concrete SELECTION 0 points6 points Today → Rebar Saved · 6 points

Tablet The same tools on a bigger canvas.

zerobimdemo.web.app/app Plans Plan 1 · Correct Plan 2 · Dates Plan 3 · Order Plan 4 · Custom Data warnings 136 K1A · Column K1Concrete pour · future date K3A · Column K1Formwork · reversed dates K5C · Column K1Rebar · reversed dates Auto-correct month (7) 7 dates corrected

Laptop Review progress and fix data at the desk.

Why 2D

The best system is the one your site team actually uses.

People on site think in plans, sections and markups. A 3D-first tool asks them to change how they work. We chose the opposite: meet them where they are, keep the model behind the scenes.

Familiar to the field

Site teams already live in plans, sections and markups. The tracker looks like the sheet in their hands, so there is almost nothing to learn. It gets used daily, not just by the BIM team.

Light on hardware

A 2D plan in a browser needs no graphics card and no heavy model to open. The phone in your pocket, a tablet or a basic laptop is enough, even on a weak site connection.

Results everyone can use

Progress is not locked inside a model file. Planners, QS, site managers and owners get the same numbers in Excel, CSV and live dashboards, with no BIM software needed.

Key features

Everything progress tracking needs. Nothing it doesn't.

Automatic BIM sync

Elements and their data stay linked to the model. Progress entered on site flows back without re-typing.

Plans integrated with the model

Work points appear directly on the floor plan, with status readable at a glance.

Custom floor plans

Set up plans per building and level, or draw your own points and polygons. Projects without a BIM model can use the tracker too.

Custom parameters

Define the required attributes per project and discipline. Your standard, not a rigid template.

Automatic roll-ups & export

Progress summaries calculated from the database. Download raw data to Excel or CSV for reporting.

Role-based access

Each role gets its own view and permissions, scoped by building and discipline.

Fluid UI/UX

Smooth zoom and pan on large plans, responsive side drawers and clear visual feedback on every action, so updating progress takes seconds, not minutes.

How it works

From model to site to report.

Connect

Link the BIM model and set up plans and required parameters for your project.

Update on site

The site team marks progress on the 2D plan. Status colors update for everyone.

Report

See roll-ups per building and discipline, and export data when you need it.

SupervisorsSite engineersBIM coordinatorsProject managersOwners & consultants
Live demo

Try the real thing. No sign-up.

This is the actual Digital Site Tracker running on sample data. Pick a plan and a short guided tutorial walks you through it step by step. Select points, fill progress, fix data warnings, even draw your own plan. Everything stays in your browser and resets when you reload.

Correct data

Plan 1 · Filled correctly

Consistent dates and stage order. Edit freely with the lasso and multi-select tools, and watch progress update.

Start tutorial →
Wrong dates

Plan 2 · Date errors

Future dates and reversed dates. Open the warnings panel, fix them one by one or use the month auto-correct.

Start tutorial →
Other error type

Plan 3 · Wrong stage order

Later stages are filled while earlier ones are still empty. Spot them on the plan and fill in the gaps.

Start tutorial →
Custom plan

Plan 4 · Draw your own

A plain floor-plan image with no BIM model behind it. Draw points and polygons on it, then fill their progress like any other element.

Start tutorial →

Free, one-time registration with email verification. Sample data only, not a real project. Project settings, dashboards and exports are part of the full demo. Request it on WhatsApp.

See it on your project.

Chat with us on WhatsApp to book a short demo. We'll walk through the tracker with a plan from your own project.